Project

Project information and Chernomorets fishing port„

Project No BG14MFPR001-1.004-0003 is entitled „Repair and rehabilitation of existing port infrastructure in the town of Chernomorets, Sozopol Municipality - Stage One“.

The project is implemented by Sozopol Municipality under procedure BG14MFPR001-1.004 of the Programme for Maritime Affairs, Fisheries and Aquaculture 2021–2027.

The total value of the project is EUR 647,000.15, provided entirely as financial grant assistance, of which:

  • €452,900.10 – European Union funding via the European Maritime, Fisheries and Aquaculture Fund;
  • €194,100.04 national co-financing from the state budget.

The project implementation period is 12 months.

Aim and scope of the project

The project aims to modernise the technical, material and organisational provision of the existing fishing port in the town of Chernomorets and to improve working conditions for fishermen, port administration and other users.

Investments are directed towards:

  • safe servicing of fishing boats;
  • extraction, launching, moving and onshore storage of vessels;
  • improving loading and unloading operations;
  • maintenance and repair of port equipment;
  • port area cleaning;
  • segregated collection and storage of waste;
  • improving fire safety;
  • digitalisation and tracking of fishing catches;
  • provision of work and protective equipment for the staff;
  • improving publicity and the electronic provision of information.
 

Approved equipment and activities

Within the project, the following have been approved:

  • work aluminium boat with equipment;
  • boat trailer with launching trolley;
  • two-tier rack system for storing 22 boats;
  • telescopic loader;
  • forklift truck with a specialised fork attachment and negative lift down to –2 metres;
  • specialist cleaning machine;
  • steam cleaner;
  • equipped tool trolley;
  • cordless tool kits;
  • recycling bins;
  • composter;
  • digital platform with QR codes for tracking the fishing catch;
 

The assets represent an interconnected system for port operations. The boat and the trailer ensure operations in the water area and the transport of vessels. The racks, the forklift and the loader are necessary for hauling out, moving and safely storing the boats. The tools and the compressor support technical maintenance. The cleaning equipment and containers serve the environmental functions of the port, while the QR platform introduces digital traceability of the fish catch.

Therefore, the project does not represent a collection of separate and unrelated purchases, but a comprehensive investment to improve safety, maintenance, environmental sustainability and the efficient management of the port.

Information about „Chernomorets“ fishing port“

Chernomorets Fishing Port is an operational municipal fishing port, managed by the municipal enterprise „Fishing Ports – Sozopol Municipality“.

The director of the municipal enterprise is Mr Georgi Peev, and the published contact telephone number is 0889 099 592.

The port serves fishing ships and boats and provides:

  • berthing and docking of vessels;
  • mooring and unmooring;
  • secure parking;
  • using a slipway;
  • unloading of fresh fish;
  • loading and unloading operations;
  • technical and administrative services;
  • access to the fish market built at the port;
 

The inner port basin, intended for manoeuvring and mooring, has an area of approximately 24,067 sq. m, and the outer area – the approach navigation channel – has an area of approximately 12,292 sq. m.

The port has breakwaters, floating pontoons, a slipway, shore infrastructure and designated areas for fishing boats.

According to the information published by the municipal enterprise, Chernomorets port has 172 boat berths. During the initial construction phase, 96 permanent boat berths were indicated, with the capacity to accommodate up to 120 boats in the inner waters and additional seasonal spaces for small vessels. The difference in the indicated capacity reflects the various stages of the port's development and the method of counting permanent and seasonal spaces.

The project is essential for the normal operation of the port and for serving a significant number of fishing vessels. The delay of procedures, the exclusion of functionally necessary assets, or the imposition of disproportionate financial corrections affect not only individual supplies, but the overall ability of the port to provide safe, environmentally friendly, and modern services.